Investor proof room

Luna Vale tour operating system

One seeded DACH launch proves the Effectum OS: a Berlin production dependency propagates through artist, tour, venue, rider, provider, Ops review, demand, and settlement, live and auditable.

seeded storyberlin launchlocal seed

Generated tour

5

DACH cities

Berlin tickets

913

850 threshold met

Forecast revenue

€35,360

2 ticket tiers

Artist payout

€12,456

before mitigation

Operating map

One dependency, end-to-end

at risk
LayerCurrent stateDetailsImpactNext action
Artist source
ready

Luna Vale

2026.05

Profile, audience signal, tour assumptions, and approval context are locked into the same story.View artist cockpit
Venue constraint
broken

Astra Kulturhaus · Berlin

1.200 cap · 22:30 curfew

grandMA3 compact lighting console is broken and blocks publish approval.HighOpen venue cockpit
Rider requirement
required

Lighting console

2026.05

The touring show file needs a programmable desk or compatible replacement.HighOpen rider cockpit
Provider mitigation
reviewing

Pulse Production Collective

grandMA3 rental desk

Rental desk located in Hamburg. Logistics check in progress. ETA impact pending.Medium
Ops action
open

Human review

effectum ops

Confirm Pulse replacement desk before Berlin publish approvalApproval gateView live audit
Ticket proof
threshold met

Berlin tickets

913 preview sold

Sell First threshold is met. Demand curve remains within forecast band with constraint applied.PositiveOpen demand cockpit
Settlement
forecast

Payout and revenue

€12,456 payout

Forecast revenue €35,360. Artist payout and Effectum take remain explicit.Open settlement

Role proof switcher

Open the same story from each network role

artist

Dynamic rider and inventory health

Rider data becomes operating risk

structured

sound

Club-grade stereo PA with front fill and sub coverage

required

lighting

Programmable lighting desk compatible with touring show file

required

power

3x63A stage power with separated audio power

required

hospitality

Vegetarian hot meal for 8 plus allergy-safe snacks

preferred

grandMA3 compact lighting console

broken

DMX output failed during last club night; rental replacement required.

local seedloading

L-Acoustics main PA

working

System test passed with front-fill alignment.

3x63A stage power

working

Distribution checked and labeled.

Ticketing and settlement

Demand and money stay in frame

threshold met

Sell First threshold

Preview tickets sold before public launch

913/850threshold met

Forecast revenue

preview ticket shop - 2 tiers

€35,360forecast

Artist payout

Before provider mitigation is approved

€12,456forecast
Venue cost25%
Provider cost15%
Artist payout share35%

Backstage proof

Auditability is visible

local seed
local seed

Backend

Seed fallback

Scenario state path is explicit

seeded

Audit

Ready to log

Resolution event pending

reviewing

Provider

Pulse Production Collective

1/3 readiness checks

mocked

Payment boundary

No payment is taken

Checkout remains simulated

Settlement is forecast until provider mitigation is approved.
Loading live action state